Quote:
	
	
		
			
				
					Originally Posted by  kayak_rat
					 
				 
				They filled the area behind the concrete block with no reinforcement?????? 
 
How old was this building? That was horribly ignorant. 
			
		 | 
	
	
 Current owner bought the building in 96.  No one is actually sure on the buildings completion date.  Inspection sticker on the service panel is either 1983 or 85 - but that also could have been just for this suite.
Yeah - no reinforcement - lack of shear design on the front wall connection - it's a butt joint with brick ties embedded in the concrete - LOL.
Our structural engineer was on-site today to approve my shoring plan and inspect - he did a cursory walk around of the entire building - and guess what?  The opposite corner (left side of building) is showing signs of stress/cracking/bowing also.  Owner wants that whole wall braced/shored as soon as we are done with this shoring to prevent a collapse.  I looked at it this after noon - we can save that wall.
I thought you'd enjoy these pictures Zack.
Ron