|
![]() |
#5 |
I break for Cubans
|
![]()
Here's the tubing and the HALO insulation
4 zones (each with a return line) First of the cement going in ![]() Messy work. The crew was very careful to not damage the heating hoses. ![]() ![]() Wall # 1 UP ![]() And #2 ![]() And the final wall ![]() Parallel chord truss construction ![]() 15 feet to the peak ![]() View from the inside ![]() Two 7 foot triple pane windows on each side ![]() Trenching the power lines ![]() My contractor. Besides by buddies who helped with the wall raising, this guy is doing the construction all himself. Have an electrician and a plumber and an HRV guy. ![]() More pics soon.
__________________
Lx I invented the cordless extension cord. |
![]() |
![]() |